Alterations and additions, designed around the house you already have
Extending or reworking an existing home is a different job from designing a new one. The existing structure, the original consent and the rules for altering an existing building all shape what is possible. We design extensions, renovations, garages and sleepouts across Feilding, Palmerston North and the Manawatū, and take each one from first measure through to an issued building consent.
How we work on an existing home
-
We start with what is there: a site visit, a measure-up of the existing house, and the council property file where one exists.
-
We draw the existing building accurately, so new work ties in properly and the consent drawings show council exactly what is changing.
-
We design the new work to suit the way you live, the sun and the site, and to sit comfortably with the existing house.
-
We work out what the alteration means for the rest of the building, including bracing, structure, insulation and drainage, and prepare the calculations to show it.
Do you need a building consent?
Not all building work needs a consent. Some small work is exempt under Schedule 1 of the Building Act 2004, as long as it still meets the Building Code. Our first meeting covers whether your project needs a consent, needs a resource consent as well, or can go ahead as exempt work.
Consent and council, handled
When consent is needed, we prepare the drawings, specification and calculations, lodge the application as your agent and answer council's questions until it is issued. Minor variations during the build are handled at no extra charge.
A fixed fee before you start
After a free first meeting, at the studio or at your place, you get a fixed fee for the agreed scope. No estimates and no hourly rates. Call 0800 639 346 or email Info@newdimension.nz.
Common questions
Do I need a building consent for my alteration?
Not always. Some small building work is exempt under Schedule 1 of the Building Act 2004, though it still has to meet the Building Code. We work out at the free first meeting whether your project needs a building consent, a resource consent as well, or can go ahead as exempt work.
Do I need the original plans of my house?
They help, but you don't need them. We measure up the existing house on site and check the council property file where there is one, then draw the existing building accurately before designing the new work.
Will an extension affect the rest of the house?
It can. New openings, removed walls and added floor area change the bracing, structure, insulation and drainage, so we work those through and include the calculations in the consent set.
How do you price alterations?
After a free first meeting at the studio or at your place, we quote a fixed fee for the agreed scope. No estimates and no hourly rates.
Our Studio
We're a small family-run studio in Feilding, designing homes across Palmerston North and the greater Manawatū for 20 years. Homes we've designed have won 25 Master Builders House of the Year awards since 2023. See the award-winning homes, or get in touch to book a free first meeting and a fixed-fee quote.



